Global Expertise Driving Australia’s Clean Energy Transition

I bring internationally recognised expertise in the integration of Battery Energy Storage Systems (BESS) and renewable generation into high-voltage networks. My leadership in protection engineering and commissioning ensures that large-scale renewable projects in Australia are delivered with world-class reliability, safety, and innovation..

🏟️ Australian Hockey Centre – HV Testing (2025)

  • Role: Led the high-voltage testing and commissioning package, including cable terminations, jointing, insulation resistance, and VLF testing.

Impact: Delivered a renewable-ready substation under tight deadlines, ensuring compliance with PSP11 and client specifications.

🌞 Solar Farm – HV Grid Connection (NSW, 2024)

  • Role: Configured protection relays (ABB REF630, GE P345) and conducted secondary injection for a 50 MW solar farm connection

Impact: Enabled safe and reliable integration of renewable generation to a 132 kV substation, reducing fault risk and ensuring compliance with AEMO requirements.

🚍 Jandakot Bus Depot – Electric Bus Charging System (2025)

  • Role: Led the high-voltage testing and Role: Supervised HV protection settings, secondary injection, and relay coordination for the bus charging infrastructure.

IImpact: Enabled sustainable transport by integrating renewable-powered EV charging with safe and reliable HV connections.

🏭 Industrial BESS + Solar Hybrid Plant (WA, 2023)

  • Role: Led commissioning and testing of a hybrid renewable system combining 10 MW BESS and 20 MW solar for an industrial facility.

Impact: Improved energy security and reduced diesel consumption by 40%, aligning with sustainability targets.

🔋 Grid-Scale Battery Storage (Queensland, 2024)

  • Role: Directed relay configuration (SEL-751, Siemens 7SD82), fault simulations, and functional testing for a 30 MW / 60 MWh BESS..

Impact: Strengthened grid stability during peak demand, aligned with AEMO requirements, and reduced commissioning risk through standardised HV testing frameworks.

🛠️ Industrial BESS + Solar Hybrid Plant (WA, 2Arc-Flash & Protection Study – Mining HV Network (QLD, 2023)

  • Role: Conducted arc-flash hazard assessments and protection coordination studies across a mining HV distribution network with renewables integration.

Impact: Enhanced safety for operators, reduced incident energy exposure by 60%, and upgraded system reliability for renewable interconnections..

+40 Renewable Projects

+120 Innovation Initiatives

+50 Industry Collaborations

+3000 Hours in Sustainable Energy