Global Expertise Driving Australia’s Clean Energy Transition
I bring internationally recognised expertise in the integration of Battery Energy Storage Systems (BESS) and renewable generation into high-voltage networks. My leadership in protection engineering and commissioning ensures that large-scale renewable projects in Australia are delivered with world-class reliability, safety, and innovation..

🏟️ Australian Hockey Centre – HV Testing (2025)
- Role: Led the high-voltage testing and commissioning package, including cable terminations, jointing, insulation resistance, and VLF testing.
Impact: Delivered a renewable-ready substation under tight deadlines, ensuring compliance with PSP11 and client specifications.
🌞 Solar Farm – HV Grid Connection (NSW, 2024)
- Role: Configured protection relays (ABB REF630, GE P345) and conducted secondary injection for a 50 MW solar farm connection
Impact: Enabled safe and reliable integration of renewable generation to a 132 kV substation, reducing fault risk and ensuring compliance with AEMO requirements.

🚍 Jandakot Bus Depot – Electric Bus Charging System (2025)
- Role: Led the high-voltage testing and Role: Supervised HV protection settings, secondary injection, and relay coordination for the bus charging infrastructure.
IImpact: Enabled sustainable transport by integrating renewable-powered EV charging with safe and reliable HV connections.

🏭 Industrial BESS + Solar Hybrid Plant (WA, 2023)
- Role: Led commissioning and testing of a hybrid renewable system combining 10 MW BESS and 20 MW solar for an industrial facility.
Impact: Improved energy security and reduced diesel consumption by 40%, aligning with sustainability targets.

🔋 Grid-Scale Battery Storage (Queensland, 2024)
- Role: Directed relay configuration (SEL-751, Siemens 7SD82), fault simulations, and functional testing for a 30 MW / 60 MWh BESS..
Impact: Strengthened grid stability during peak demand, aligned with AEMO requirements, and reduced commissioning risk through standardised HV testing frameworks.

🛠️ Industrial BESS + Solar Hybrid Plant (WA, 2Arc-Flash & Protection Study – Mining HV Network (QLD, 2023)
- Role: Conducted arc-flash hazard assessments and protection coordination studies across a mining HV distribution network with renewables integration.
Impact: Enhanced safety for operators, reduced incident energy exposure by 60%, and upgraded system reliability for renewable interconnections..
Across these projects, I have integrated more than 100 MW of renewable and storage capacity into Australia’s HV networks. My leadership in commissioning, protection, and HV testing demonstrates internationally recognised expertise, contributing directly to Australia’s clean energy future and positioning me as an exceptional global talent.
+40 Renewable Projects
Successful delivery of clean energy and HV infrastructure projects across Australia, Chile, and the United States..
+120 Innovation Initiatives
Advanced protection schemes, HV testing frameworks, and renewable integration solutions implemented in critical projects
+50 Industry Collaborations
Strategic partnerships with utilities, global manufacturers, and contractors advancing renewable and HV technology
+3000 Hours in Sustainable Energy
Dedicated to HV testing, BESS commissioning, and renewable integration across Australia’s clean energy sector.